We picked up a 2004 1860 g3 DLX center console in Mobile, AL in mid Feb. Work started right away, and she just had her first trip.
The boat had a small factory deck that needed removed first:
Some bracing up front:
Bracing for the deck. We decided to close up the back side with a hatch to storage and ballasts etc. We also did bracing for the ballasts, converters, power strips, etc to mount to:
Deck metal on:
We went with fully removable enclosed rails. We opted to bend the metal on a break rather than welding:
The boat had a small factory deck that needed removed first:
Some bracing up front:
Bracing for the deck. We decided to close up the back side with a hatch to storage and ballasts etc. We also did bracing for the ballasts, converters, power strips, etc to mount to:
Deck metal on:
We went with fully removable enclosed rails. We opted to bend the metal on a break rather than welding: